One of the Leading Banks in Oceanic Region with large presence in Asia- Pacific and Europe
UAT of Customization done for the Bank’s Asian Entities (Acquired by the Bank in Retail, Institutional and Credit card business)
Asset: General Loans, Corporate Loans, Syndicated Loans, Collaterals, Limits
Liabilities: Current A/c, Savings A/c, Term deposits
Others: EOD/BOD, SI, Inventory Reconciliation, Payment Systems
PSGL (General Ledger System): Outbound, and Inbound Txn interface
SPARROW / IST: ATM Switch
IVR: Interactive Voice Response
AML
MAT: Minimum Acceptance Testing: This is a Sanity test don e to ascertain the quality of the Build and the environment being used for testing
Progression Testing (ST): The cycle wherein the Enhancements / Patches are being tested in depth and certified as per the business requirement
System Integration Testing (SIT): This is done to ascertain if the System is in Sync with all the required Interfaces and there is no Downstream impact
Regression Testing: The cycle wherein the existing Functionalities are being tested and ensured that it does not break
End to End Testing (ETE): This is done to certify that the required data is in the defined format which is being passed on to the Downstream systems and are successfully uploaded in all the required Interfaces.
Back out Testing: The cycle wherein the new Enhancements / Patches are reverted and ensured that the system comes back to the original shape in case of any unforeseen issues during deployment
SME’s- Reviewing UAT detailed test plan and Test scenarios, Supporting test execution, Liaising with test team, Interacting with end users
UAT Lead- Leading the respective test phase from planning to completion
Test Analysts– Developing test cases, Executing Test cases, Raising defects, Retest Defect Fixed
Involved in all the phases of testing right from the requirement discussions to certifying the enhancement / Patch. Testing Estimation and resource allocation. Knowledge Transfer and Hand holding to the new team members
Preparation of HLTC’s, DLTC’s, Uploading the same to QC, Test case execution, Raising defects, follow up on the defect status, Retesting of defects, publishing the various Testing Matrix reports as per the clients requirement
A Team of 20 members on an average were involved.
Experience Range of 3 – 12 years in various aspects of banking domain including Testing
Average Experience of Team members 3- 4 years
Parallel work on Multiple tracks to meet schedules
Team Involved in End-to-End Testing, System Testing, System Integration Testing
Core Team involved in Critical Functional Testing